Project: Install a grout curtain
and pressure point
Client: Dew Construction / British Waterways
The slipway was leaking in a number
of places.
Water was tracking around the slipway as
well as through the slipway itself.
In some places there was a
constant flow of water.
The grout curtain was drilled into the top
of the slipway.
We also jet washed the whole structure to remove plantation and loose material.
Having installed the grout curtain to stem the flow of water we pressure pointed the stones where necessary and cleaned the slipway.
The client was delighted with the delivery
of the project.
(See video below images)
|