Work is continuing on the A59 between Skipton and Harrogate.

This has been a challenging start to a difficult project due to the access restraints and location. Condor Projects Ltd were the only company in the UK willing to take on this challenge.

Condor projects came up with a design that allowed the A59 to remain open to traffic throughout the project. Soil nails will be drilled into the existing retaining wall to a depth of 12m using our Husqvarna/Marini drilling rig.

Work is expected to continue through until December.