Last week work continued on Carwinley Low Bridge in Cumbria.
The Bridge has been grouted via the installed anchors with up to 3 tonne of OPC grout pumped per day.
The bridge is in such a poor condition due to years of washing out of material and movement of the structure.
Condor Projects Ltd will continue to pump grout until a return of grout is achieved throughout the installed anchors as requested by our client.