Carwinley Low Bridge update

Last week work continued on Carwinley Low Bridge in Cumbria.

The Bridge has been grouted via the installed anchors with up to 3 tonne of OPC grout pumped per day.

The bridge is in such a poor condition due to years of washing out of material and movement of the structure.

Condor Projects Ltd will continue to pump grout until a return of grout is achieved throughout the installed anchors as requested by our client.