Condor Projects completed another successful soil nailing contract for the Highways Department at North Yorkshire.

Working in a compact area the wall of the road bridge over the Leeds to Liverpool canal was stabilised with a quick turnaround and within time deadlines despite the cold temperatures and hard material behind the external wall. The video shows the nails being drilled into the retaining wall to a depth of 3 metres.