Dew construction approached Condor projects to deal with a severe leak to a spilway on Upper Foulbridge reservoir.

The Spilway was leaking in a number of places. Water was tracking around the slipway as well as through the spilway itself.

In some places there was a constant flow of water. The grout curtain was drilled into the top of the slipway. We also jet washed the whole structure to remove plantation and loose material.

Having installed the grout curtain to stem the flow of water we pressure pointed the stones where necessary and cleaned the slipway.

The client was delighted with the delivery of the project.